Work Log for: 11/21/2009
- Participants:
- paul thomasberg, Sara C, Rick J., Woody Starr, Brian-(hutchs), Chris K. Lev Striker, Rahm, Jerry M, and many others but I lost some of my notes.
-
- Hours Worked:
- 80
-
- Work Performed:
- These hours were in relation to clearing all the BBFT 09 routes. Some of which were sorely neglected. The lower section of TR 61 had 100 trees. Cache MT area had at least 100 trees down in addition some sections were completely overgrown by snow brush. In places extensive tread and drainage work was done. I want to thank all the volunteers whom are willing to go out with me prior to the tour fully understanding there in for a full pull. Special thanks the Jerry M and Rahm and his friend for the FULL day of cutting snow brush (brutal) and Chris K whom I called in a last minute favor to make the Alpine Horse trail ridable the day before the tour went through. I\'ll pay for that favor one day.
« Back